Silverwater Alterations
Value: $50,000 – 100,000 + GST
Details: A Class Engineering was contracted by Morph Projects to supply the structural steel for the transformation of the All Pumps Building in Silverwater. Working closely with both Morph Projects and the team at All Pumps resulted in a seamless integration from old to new.
Reference:
Morph Projects recently engaged A Class Engineering to fabricate and install the structural steel for alterations to the All Pumps building, 100 Silverwater Rd., Silverwater.
Refurbishment projects are always challenging, and this one was no exception.Measurements and fixing points etc were checked and rechecked by the A Class team, and this led to an excellent installation.
All work was completed on time and as specified, and modifications caused by on-site changes were accommodated and managed quickly, professionally, and cost effectively.
Morph Projects has no hesitation in recommending A Class Engineering and their structural steel fabrication work. They are a strong, professional team, and we look forward to working with them again.
Michael Gilles – Director, Morph Projects